JavaScript is required to use Bungie.net

OffTopic

Surf a Flood of random discussion.
Edited by HiddenAlignment: 3/21/2021 8:23:50 PM
9

RPAcademy Study Hall 3/21/2021

[i]The main Academy campus is complete. Construction for the Training Hall, Lecture Hall, Terrarium, Cafeteria, Lab and Main PA Tower are finished. However, several stands seem to be undergoing construction as well. A large area of OffTopic is filled with ringing that eventually turns into a voice.[/i] [b]Alignment[/b]: “Darn it, I thought we got that fixed! Oh well. To anyone that hears this, the Academy is once again open for another Study Hall. For the students who want to improve themselves, visit me in the Terrarium. If you’re just a visitor who wants to explore campus and consider becoming a student, all I ask is that you be respectful and mature. And don’t break anything! We just finished making our basic foundation!” [i]The area briefly rings again and goes silent.[/i]
English
#Offtopic #rpa

Posting in language:

 

Play nice. Take a minute to review our Code of Conduct before submitting your post. Cancel Edit Create Fireteam Post

You are not allowed to view this content.
;
preload icon
preload icon
preload icon